Project Client Services/Cost
Sunlight
Foods, Inc. Sunlight
Foods, Inc. CM,
E, C, O&M / $ 180,000
0.1 MGD WWTP,
Pre-treatment 3550 NW 112th
Street
Food Processor Miami,
Florida 33167
Nutmeg
Mills, Inc. VF
Imagewear, Inc. CM,
E, C, O&M / $ 176,000
0.1 MGD WWTP,
Pre-treatment 4408 West Linebaugh Avenue
Sports Apparel Tampa, Florida 33624
Bayfront
Medical Center Bayfront
Medical Center CM, E, P, C,
O&M/ $ 120,000
0.5
MGD WWTP, Pre-treatment 750 5th
Avenue South
Hospital
- Incinerator St.
Petersburg, Florida 33701
Sony Corporation Sony
Corporation E,
P, O&M / $ 56,000
Treatablity
Study & WWTP Dothan,
Alabama
Computer
Media Manufacturer
Environmental Assessment General
Cable Company E, P, C, O&M
/ $ 75,000
Lead
Removal, Underground Tank 2515
East Hanna
Wire
and Cable Manufacturer Tampa, Florida
1.5 MGD Wastewater Treatment Lucille
Farms CM,
E, C / $ 3,000,000
Cheese
Manufacturing Plant Swanton, Vermont
NPDES Discharge Proctor
& Gamble E,
C, O&M / $ 1,200,000
0.5
MGD Wastewater Treatment Bartow, Florida
Citrus
Manufacturing
Environmental Assessment Genca CM,
E, P / $ 20,000
Phase
II, Site Clean - up 13805 58th
Street North
Tool
& Die Manufacturer Clearwater,
Florida 33760
Central
Florida Aircraft Central
Florida Aircraft CM, E, P
/ $ 750,000
Refinishing, Inc P.O. Box 420315
Hazardous Waste Clean Site Kissimmee, Florida 34742
200
GPM Wastewater Treatment Consource
Recycling Inc E,
CM, E / $ 297,000
System
for recycling plastics plant Tampa,
Florida
0.5 MGD Biological wastewater Tampa
Bay Fisheries, Inc. E,
CM, O&M / $800K
treatment system for removal of 3060
Gallagher Road
nitrogen, P, BOD and TSS Dover, Florida 33527
Seafood Processor
50,000 GPD wastewater treatment General
Cable Corp. E, O, O&M / $2M
system
design and installation Tampa, Florida
electroplating
wastewater treatment
0.5 MGD wastewater treatment system Tampa
Bay Fisheries E, P, C,
O&M / $0.5M
and
sprayfield for land application Dover,
Florida
Solution System Pumping System General
Cable Corp. E, O&M /
$ 100,000
for
drawing solution and cooling tower Marshall,
Texas
and
chiller system
2.0 MGD wastewater treatment Patterson
Frozen Foods E, O&M / $ 2.5M
system design and installation. Patterson,
California
Biological treatment, BOD, TSS
Nitrogen
and P removal
Industrial facility, system and process Ffhoenix Cuirve, LLC E, P, C, CM, O&M/$ 30.5M
design and equipment installation Santa
Teresa , NM
Compound materials/handling and General
Cable Corp. E, O&M /
$ 5.5M
conveying system design and installation Watkinsville,
GA
CV line, extrusion process design General
Cable Corp. E, O&M /
$ 12.5M
system design, installation and relocation Monticello, IL
0.5 MGD wastewater treatment system American Wire & Cable E, O&M / $ 3.5M
design and installation for BOD, TSS, P, Manila,
Philippines
and nitrogen removal
Stack Testing, Air Permitting Florida
Power and Light E, O&M / $ 5,000/Test
Annual
Operating Reports, Florida
Mining & Materials
Visible
Emissions Holly
Hill Citrus
E - Engineering P
- Procurement C -
Construction
CM - Construction Management O&M
- Operations & Maintenance